Thanks to the faith and generosity of out parish community, the new Parish Life Center/Gymnasium is finally becoming a reality.
Check back often to view photos of construction progress. Click any image to view gallery. |
| |
|
| FEBRUARY 2012 |
|
 |
 |
 |
 |
|
|
| Gym flooring has arrived! |
Gym interior |
View of the northeast corner |
Close up of gym walls |
|
|
| DECEMBER 2011 / JANUARY 2012 |
|
 |
 |
 |
 |
 |
 |
 |
|
|
| View of the east side |
Gym ceiling |
Windows and frames installed in stage area |
Windows installed in the south entry |
Siding being installed on west wall |
View of stage opening from the gym |
View of stage opening |
|
|
| NOVEMBER 2011 |
|
 |
 |
 |
 |
 |
 |
 |
 |
|
|
| Plywood going up on west side of the gym |
Framing on the east side of the gym |
Plywood going up on the north wall of gym |
View of the roof and HVAC enclosure |
Roof joists over the kitchen |
Framing the roof of the south lobby |
Another view of the roof |
South lobby roof being installed |
|
|
| OCTOBER 2011 |
|
 |
 |
 |
 |
 |
 |
|
|
| Big Toy |
Preparing the amphitheater seating area for concrete |
Poured cement in the amphitheater seating |
Crane installing roof trusses |
Installing the roof trusses |
Early morning at the work site |
|
|
| SEPTEMBER 2011 |
|
 |
 |
 |
 |
 |
 |
|
|
| Truck ready to pour wall |
First wall poured |
Playground equipment set |
Preparing subground of gym floor |
West foundation wall with drainage mat |
Stem and retaining wall are poured |
|
|
| AUGUST 2011 |
|
 |
 |
|
|
|
| First concrete pour |
Setting rebar for the gym wall |
|
|
|
|
|
|
| JULY 2011 |
|
 |
 |
 |
 |
|
|
|
|
| Demolition begins on upper parking lot |
Playground comes down |
Preparing the slope for the amphitheatre |
Hard at work on the lower parking lot |
|
| |
|