FEBRUARY 2012  
Gym flooring has arrived! Gym interior View of the northeast corner Close up of gym walls    
Gym flooring has arrived! Gym interior View of the northeast corner Close up of gym walls    
DECEMBER 2011 / JANUARY 2012  
View of east side Gym ceiling Windows and frames installed in stage area Windows installed in the south entry -Jan 10.jpg Siding being installed on west wall View of stage opening from the gym View of stage opening    
View of the east side Gym ceiling Windows and frames installed in stage area Windows installed in the south entry Siding being installed on west wall View of stage opening from the gym View of stage opening    
NOVEMBER 2011  
Plywood going up on west side of the gym Plywood going up on west side of the gym Plywood going up on the north wall of gym  View of the roof and HVAC enclosure Roof joists over the kitchen Framing the roof of the south lobby Another view of the roof South lobby roof being installed    
Plywood going up on west side of the gym Framing on the east side of the gym Plywood going up on the north wall of gym View of the roof and HVAC enclosure Roof joists over the kitchen Framing the roof of the south lobby Another view of the roof South lobby roof being installed    
OCTOBER 2011  
Big Toy Preparing the amphitheater seating area for concrete Poured cement in the amphitheater seating Oct. 24th: Crane installing roof trusses Oct. 25th: Installing the roof trusses Early morning at the work site    
Big Toy Preparing the amphitheater seating area for concrete Poured cement in the amphitheater seating Crane installing roof trusses Installing the roof trusses Early morning at the work site    
SEPTEMBER 2011  
Truck ready to pour wall first wall poured playground equipment set September 26th: Preparing subground of gym floor West foundation wall with drainage mat Stem and retaining wall are poured    
Truck ready to pour wall First wall poured Playground equipment set Preparing subground of gym floor West foundation wall with drainage mat Stem and retaining wall are poured    
AUGUST 2011  
August 10: First concrete pour  August 17: Setting rebar for the gym wall  
First concrete pour Setting rebar for the gym wall    
JULY 2011
July 18: Demolition begins on upper parking lot  July 18: Playground comes down July 20: Preparing the slope for the amphitheatre July 26: Hard at work on the lower parking lot 
Demolition begins on upper parking lot Playground comes down Preparing the slope for the amphitheatre Hard at work on the lower parking lot  
   